Live 20 practitioner certifications live · First lesson free on every course Back to main site →

The 11-category authorisation map: five principal services plus six network authorisations

The Principal Telecom Services Rules 2026 define five service authorisation categories. The Network Authorisation Rules 2026 define six network authorisation categories. Together they replace the multi-layered Unified Licence with an 11-box authorisation grid. This lesson maps every operator to the correct box.

Free preview 11 min read Verified

The Unified Licence framework under the Indian Telegraph Act 1885 was famously multi-layered. A single UL could carry Unified Access Service, National Long Distance, International Long Distance, ISP Category A, Public Mobile Radio Trunking, VSAT, and other overlays with separate fees, entry conditions and compliance obligations for each. Infrastructure sat separately as Infrastructure Provider Category-I (IP-I) registration and Infrastructure Provider Category-II licence. The whole edifice was administered through contractual licence conditions that could be varied by DoT.

The 2026 authorisation regime replaces that with an 11-box grid: five principal service authorisations governing what services you can provide to end-users, and six network authorisations governing what network infrastructure you can operate. Each box has its own entry conditions, fees, obligations, and 20-year default validity. This lesson walks the grid and maps every operator type to the correct box.

The five principal service authorisations

The Principal Telecom Services Rules 2026 (G.S.R. 513(E) dated 24 June 2026) prescribe five service authorisation categories [L4-C1].

AuthorisationScopeTypical holder
Unified Service Authorisation (USA)Covers Access Service and Long Distance Service under one authorisation. National scope.Airtel, Jio, Vi, BSNL (the four large telcos that currently hold Unified Licences with UAS overlay)
Access Service Authorisation (ASA)Voice and data access services to end-users within a defined service area. Successor to the UAS overlay.Regional telcos, MVNOs applying as VNOs
Wireline Access Service AuthorisationWireline (fibre to the home, DSL, coax) services in a defined area. Successor to the wireline-only UAS variant.Tata Play Fiber, ACT Fibernet, Hathway, YOU Broadband, small ISPs with fibre plant
Internet Service Authorisation (ISA)Internet access services including via wireless / cable / fibre. Successor to ISP Category A / B / C.ISP licensees migrating from ISP-A / B / C
Long Distance Service Authorisation (LDSA)National Long Distance and International Long Distance. Successor to NLD and ILD licence categories.Reliance Jio Infocomm (NLD/ILD), Bharti Airtel (NLD/ILD), Tata Communications (NLD/ILD)

Each principal service authorisation is valid for 20 years and can be applied for as Network Service Operator (NSO, operating your own network) or Virtual Network Operator (VNO, wholesale-purchase capacity from an NSO and retail to end-users) [L4-C2]. The NSO / VNO choice determines your capital-expenditure profile, your regulatory scrutiny surface, and your commercial flexibility.

The six network authorisations

The Network Authorisation Rules 2026 (notified 20 July 2026) prescribe six network authorisation categories [L4-C3].

AuthorisationScopeAnnual feeTypical holder
Infrastructure Provider (IP)Passive infrastructure: towers, dark fibre, ducts, right of way. Successor to IP-I registration.NilIndus Towers, ATC India, Sterlite Tech, TCL, RailTel
Digital Connectivity Infrastructure Provider (DCIP)In-building solutions, campus Wi-Fi at scale, distributed antenna systems, small-cell densification.NilFrog Cellsat, iBwave India partners, ANH Global, in-building solution integrators
Internet Exchange Point (IXP)Layer 2 peering fabric for interconnection between networks. Public and private IXPs.NilNIXI (National Internet Exchange of India), DE-CIX India, Extreme IX, Mumbai IX
Satellite Earth Station Gateway (SESG)Ground segment for satellite networks: hubs, gateways, feeder links, RF converters.NilStarlink India gateways, Jio-SES gateways, Eutelsat OneWeb India gateways, Nelco (Tata Group)
Cloud-hosted Telecom Network (CTN)Telecom network functions hosted on cloud infrastructure (Open RAN control plane on cloud, 5G core on cloud).NilCloud providers hosting telecom workloads: AWS India, Azure India, GCP India, Yotta, Sify
Mobile Number Portability (MNP)MNP clearinghouse operations for cross-operator number portability. Divided into two zones covering India.1 percent of AGR or 30 percent of applicable entry fee, higher of the twoMNP Interconnection Telecom Solutions (MNP-IT), Syniverse Technologies India

The annual-fee column is the eye-opener. Only MNP carries an annual authorisation fee under the 2026 Rules. The other five categories charge only entry fees. Compare this to the old regime where every category attracted its own annual licence fee. The revenue design shift is deliberate: DoT is moving revenue collection from annual licence fees on infrastructure operators to the 5 percent of AGR Universal Service Levy under the Digital Bharat Nidhi and to spectrum charges (auction proceeds for Section 4 categories, administrative pricing for Fifth Schedule satcom).

The 11-box grid: mapping every operator type

An operator can hold one principal service authorisation and multiple network authorisations. Or the operator can hold only a principal service authorisation and buy network capacity from IPs. Or only network authorisations if you are pure infrastructure without end-user services.

OperatorPrincipal service authNetwork auth(s)
Reliance Jio InfocommUnified Service Authorisation (USA)Owns IP (dark fibre + towers via Jio-owned Reliance Digital Fibre) + likely SESG (Jio-SES) + CTN (Jio Cloud)
Bharti AirtelUnified Service Authorisation (USA)Owns IP (Indus Towers stake) + LDSA (NLD/ILD) merged in USA + Nxtra CTN for own cloud
Vodafone IdeaUSARents IP capacity; may hold DCIP for enterprise
BSNLUSAOwns full IP + DCIP + CTN (BSNL-owned)
Tata Play FiberWireline Access Service AuthorisationRents IP from parent; may hold DCIP for MDU deployments
ACT FibernetWireline Access Service AuthorisationOwns some passive infra; may hold IP for that
HathwayWireline Access Service Authorisation + Internet Service AuthorisationOwns IP (coax plant) + possible DCIP
Tata Play (DTH)Watch Broadcasting Rules 2026 draft (2 Oct 2026 consultation close)SESG (uplink teleport) + Draft Broadcasting Rules migration path
Starlink IndiaGMPCS via IN-SPACe + likely Access Service Authorisation for direct-to-consumerSESG (multiple ground stations under construction)
Jio-SESGMPCS via IN-SPACe + wholesale to Jio USASESG (Jio-SES gateway)
Eutelsat OneWebGMPCS via IN-SPACe + wholesale via Bharti AirtelSESG (Mehsana gateway)
Indus TowersNone (pure infrastructure)IP (national)
NIXINone (peering only)IXP (national)
AWS India / Azure India / GCP IndiaNone (if only hosting third-party telecom workloads)CTN
Yotta / SifyInternet Service Authorisation (if providing internet access) + CTNIP (data centres) + CTN
MNP-IT (MNP Interconnection Telecom Solutions)NoneMNP (zonal)
WhatsApp / Telegram / Signal (OTT communication)None (not a telecom entity)None; but TIUE under TCS Amendment 2025 + SIM binding directive addressee

Read your organisation off the table. If it does not appear, the closest match is usually right. If two boxes are candidates (for example a large ISP that also holds an ILD for corporate customers), you may need two authorisations.

The one row that will surprise you: OTT communication

WhatsApp, Telegram, Signal, Arattai, JioChat, ShareChat, Josh, Snapchat are not currently classified as telecommunication entities under the 2023 Act. The Union Minister for Communications clarified in December 2023 that OTT communication services are not covered under the Telecom Act 2023 [L4-C4]. Subsequent May 2024 statements by the DoT Additional Secretary softened that position to "under inter-ministerial consultation." The Cellular Operators Association of India (COAI) has argued that OTT access services should be subject to the same licensing framework as telecom operators.

Practical position as of 6 September 2026: OTT communication apps do not hold or need a principal service authorisation or a network authorisation. But the 28 November 2025 DoT SIM binding directive under the TCS Amendment Rules 2025 clearly reaches these platforms via the Telecommunication Identifier User Entity (TIUE) category. They are regulated as consumers of telecom identifiers rather than as telecom entities. Module 4 walks the compliance path in detail.

The NSO / VNO choice

Every principal service authorisation can be held as Network Service Operator (NSO) or Virtual Network Operator (VNO). An NSO owns and operates its own network infrastructure. A VNO purchases wholesale capacity from an NSO and retails end-user services.

The choice determines: (a) capital expenditure profile (NSO carries the network capex; VNO carries only the customer-facing platform), (b) regulatory scrutiny surface (NSO is subject to Rule 25(3) data localisation for its network systems; VNO inherits that indirectly through its NSO contract), (c) commercial flexibility (NSO has full control of the roadmap; VNO can move faster on customer experience but is dependent on NSO capacity terms), (d) migration path (holders of UL(VNO) at the end of the Telegraph Act regime can migrate to VNO-flavoured principal service authorisations under the Migration Rules 2026).

Module 2 walks the NSO / VNO choice in detail with a decision matrix. For a first read, the rule of thumb is: if you own physical infrastructure and want to control your roadmap, apply as NSO. If you are a fast-mover retailer of connectivity or communication services with no infrastructure appetite, apply as VNO.

Next: enforcement archetypes and the quarterly compliance calendar

The 11-box grid tells you where you sit. The next lesson tells you what happens if you fall out of the box. Five enforcement archetypes from the 2024 to 2026 window, and the quarterly compliance calendar for a mid-size ISP that keeps you inside.

11-category authorisation map
DoT Authorisation Access Principal #1 Internet Principal #2 NLD / ILD Principal #3-4 Satellite Principal #5 Infrastructure Network #1 Resale/Lease Network #2-3 M2M Network #4 Captive/Exp. Network #5-6
Every claim in this lesson is cited. Yellow markers like [L1-C1] are clickable. Click any to see the verbatim text of the Section, Rule or judgment we're relying on. Learn how we verify content ›

Preview in progress 7 more modules waiting behind enrolment

Enjoying the preview? Here's what enrolment unlocks.

  • All 7 paid modules (35 lessons)
  • Complete citation register — every claim linked to the primary source
  • Final exam: 40 questions, unlimited retakes
  • Verifiable certificate with public verify URL and LinkedIn share
  • Lifetime access plus every future update
Inclusive of 18% GST. Certificate on pass. LinkedIn-shareable. Lifetime access. Course updates included.
Citations
Principal Telecom Services Rules 2026, G.S.R. 513(E) dated 24 June 2026 (Principal Telecom Services Rules 2026) L4-C1
Telecommunications (Authorisation for Provision of Principal Telecommunication Services) Rules 2026 notified vide G.S.R. 513(E) dated 24 June 2026 by the Ministry of Communications. Operationalises Section 3(1)(a) of the Telecom Act. Replaces the multi-layered Unified Licence framework under the Indian Telegraph Act 1885 with a simplified authorisation regime. Prescribes five principal service authorisation categories: Unified Service Authorisation, Access Service Authorisation, Wireline Access Service Authorisation, Internet Service Authorisation, and Long Distance Service Authorisation (LDSA). Authorisation valid for 20 years. Applicants may apply as Network Service Operator (NSO) or Virtual Network Operator (VNO). Data localisation and integration of satellite networks under the authorisation umbrella are core features. VERIFY: gazette PDF for exact terms.
Migration Rules 2026, Migration portal opens 25 June 2026 (Terms and Conditions for Migration Rules 2026) L4-C2
Telecommunications (Terms and Conditions for Migration) Rules 2026 prescribe the framework for existing Unified Licence holders (and Unified Licence VNO holders) to migrate to the authorisation regime under Section 3(1) of the Telecom Act. Migration portal on the DoT eServices platform opened on 25 June 2026 for all applicants. A licensee who continues to satisfy the eligibility conditions under the authorisation rules may apply for migration. Non-migrated licences continue on existing terms until expiry but are not renewed. VERIFY: exact G.S.R. number and gazette date, and the specific migration window (voluntary vs deemed) applicable to each licence category.
Network Authorisation Rules 2026, Notified 20 July 2026 (Network Authorisation Rules 2026) L4-C3
Telecommunications (Authorisation for Telecommunication Network) Rules 2026 notified 20 July 2026 under Section 3(1)(b) of the Telecom Act. Prescribes six categories of network authorisation: (i) Infrastructure Provider (IP, formerly IP-I); (ii) Digital Connectivity Infrastructure Provider (DCIP); (iii) Internet Exchange Point (IXP) Provider; (iv) Satellite Earth Station Gateway (SESG) Provider; (v) Cloud-hosted Telecommunication Network (CTN) Provider; (vi) Mobile Number Portability (MNP) Provider. Only MNP carries annual authorisation fee (1 percent of AGR or 30 percent of applicable entry fee, higher of the two). Other five categories have no annual authorisation fee. Rule 25(3) mandates that every system of a telecommunication network sit inside India along with all associated data, logs and information. VERIFY: G.S.R. number.
Telecom Act 2023, Act No. 44 of 2023 (assented 24 Dec 2023) (The Telecommunications Act, 2023) L4-C4
The Telecommunications Act 2023 (Act No. 44 of 2023) received Presidential assent on 24 December 2023 and was published in The Gazette of India Extraordinary Part II Section 1 the same day. Replaces the Indian Telegraph Act 1885, the Wireless Telegraphy Act 1933 and the Telegraph Wires (Unlawful Possession) Act 1950. Contains 62 sections in 11 chapters plus 3 schedules. Enforcement staggered across three notifications: 21 June 2024 (Sec 1-2, 10-30, 42-44, 46-47, 50-58, 61-62 effective 26 June 2024), 4 July 2024 (Sec 6-8, 48, 59(b) effective 5 July 2024) and 23 June 2026 (Sec 3(1) and 3(6) enabling the authorisation regime). Sections 4, 5, 9, 31-41, 45, 49, 59(a) and 60 remain unnotified as of 6 September 2026.
Free preview
Reading Module 1. Enrol to unlock the rest of the course.
Module 1: The Telecom Act operator's world
Module 2: The authorisation regime: Principal Telecom Services + Migration
  • From licence to authorisation: what Section 3(1) and 3(6) actually changed
  • Principal Telecom Services Rules 2026: the five service categories
  • NSO vs VNO: choosing between own-network and wholesale-buy
  • Migration Rules 2026: portal open, voluntary path, expiry math
  • The DoT eServices portal: screen-by-screen walkthrough
Module 3: Network authorisations + Right of Way Rules 2024
  • The six network authorisations under the 2026 Rules
  • Rule 25(3) data localisation: architectural implications for every network authorisation
  • MNP authorisation and the two-zone fee structure
  • RoW Rules 2024: single-window portal, deemed approvals, state variations
  • Spectrum: auction default, First Schedule administrative allocation, TRAI satcom pricing
Module 4: Telecom Cyber Security Rules 2024 + TCS Amendment 2025 + SIM binding
  • Telecom Cyber Security Rules 2024: anatomy of G.S.R. 720(E)
  • The 6-hour incident SLA and the CTSO role in operation
  • IMEI registration, CEIR integration, and telecom identifier security
  • TCS Amendment Rules 2025: TIUE and the Mobile Number Validation platform
  • The 28 November 2025 SIM binding directive to OTT communication apps
Module 5: Critical Telecommunication Infrastructure Rules 2024
  • CTI Rules 2024: scope and the designation process
  • Network architecture disclosure + vulnerability and threat and risk analysis
  • Government inspection access: hardware, software, data
  • The CTI + CERT-In + NCIIPC triangle: reconciling three regulators
  • The first 30 days after a CTI designation letter
Module 6: Lawful Interception + Temporary Suspension (Section 20)
  • Lawful Interception Rules 2024: what supersedes Rules 419 and 419A
  • The Central Review Committee: composition, cadence, power to set aside
  • Temporary Suspension of Services Rules 2024: internet shutdown procedure
  • Anuradha Bhasin v Union of India (2020) and the shutdown doctrine
  • The operator SOP when a Section 20 order lands
Module 7: User Identification 2026 + Sanchar Saathi + Anti-spam (TCCCPR)
  • User Identification Rules 2026: live biometric verification for every SIM event
  • BIVS implementation architecture and the exclusion-risk protocol
  • The Sanchar Saathi consumer-facing ecosystem
  • TCCCPR Second Amendment Regulations 2025: header authentication and annual self-cert
  • DLT platform mechanics and consent-based header operations
Module 8: Satcom + Digital Bharat Nidhi + adjudication + operator playbook
  • Satcom authorisation: Fifth Schedule administrative allocation and the OneWeb / Jio-SES / Starlink timelines
  • TRAI satcom pricing May 2025 and the DCC September 2025 back-reference
  • Digital Bharat Nidhi Rules 2024: replacing USOF with the 5 percent AGR levy
  • Adjudication and Appeal Rules 2025: defending a Section 48 proceeding
  • The operator playbook and handoff of all 12 templates